Once you ve figured out the size of the border row measure back from the cross tee slots and cut your main tees to size.
Drop ceiling grid installation instructions.
Literally measure and make a to scale drawing of each room.
The cross tee slots must line up.
If you are using 2 x 2 panels you need to lay out your grid differently.
Use a chalk line or tie strings across your room every 4 ft 1 2 m.
Slope 1 in 1 8mtr in any plane if more use counter splaying wires step 5.
Secure the end of a chalk line on one end of.
Step 1 design your drop ceiling grid it starts with a game plan.
Putting in the grid system 1.
The measurements will be the same if the grid is square.
300mm 45 0 45 0 300mm 1 80mtr.
Suspended ceiling for 2 x 4 ceiling panels.
Be sure the suspension wires are securely fastened.
Additional 2 cross tees dotted lines are installed parallel to the main tees 2 o c.
Don t assume the wall is straight.
Three easy steps to install your ceiling 1.
Cut the main runners to fit the length of your room perpendicular to the joists.
Install wall molding mark the desired new ceiling height on the wall.
Check the original sketch of the room to determine this location.
Installing 2 x 4 drop ceiling panels determine the size of the border panels to get the length of your border panels divide the width of the room by the.
Installation of hangers ceiling soffit duct section threaded rod hanger wire vertical support slotted bar main tee for suspending the ceiling.
Measure and cut the main tees according to a cross tee guideline.
Drop into place a.
Measure across the diagonals of the 2 x 4 opening.
Cut the main tees for the drop ceiling hangers.
To allow for ceiling tile installation and accessibility the minimum drop is 3 with traditional hanger wire or 2 5 with quickhang grid hooks.
Hanger wire can be suspended for ceiling installation.
Join sections of main beam.
Lift panel at angle through grid.
Trim border panels cutting panel face side up b.
Snap the chalk line tool to create this.
Screw an eyelet into every.
Quickhang instructions are notated by a gray background.
If the grid is not square shorten one of the main beams until the diagonals are equal.
Install hanger wire or.
A b step install panels 3 2 x 2 installation 1.
Install two four foot cross tees between the two main beams in line with the first two border cross tees.
Then layout your tile spacing and see how it looks.
Apply them to the ceiling with screw eyes screw hooks nails or by drilling.
The main runners will support the.