Concrete never truly dries and depending where you live it could be a real desaster.
Diy nail down wood floor.
This is in response to emily fasio.
It will hit the wall and the force would push the wood against the baseboard which would lose the 3 8 expansion and contraction.
Nail down most common wood subfloor solid engineered floors only on grade or above grade less risk for sanding.
This helps prevent moisture from below and helps prevent squeaks in dry seasons.
It is important to face nail the first row because the pneumatic nail can t get down in there.
Height change is too much consider laying a laminated wood floor instead.
Do it yourself tips.
It will add less than 3 4 in.
Face nail the entire first row and remember to keep the board lengths random.
Nail threshold or transition strips in place where the edge of the floor is exposed.
Install them by simply laying them in their correct location and finish nailing them to the subfloor.
Screws into the joists.
When laying a wood floor on concrete you must use an underlayment.
I will show you every trick in the book to get a perfect finish most.
Nail it to the baseboard not to the floor or subfloor.
Remove the existing floor covering and pry up the underlayment with a pry bar leaving the subfloor intact.
As with the floor planks use an awl to tap the nail heads down so they sit below the surface of the threshhold.
Staple down 15 lb.
Asphalt paper or red rosin paper over the sub floor lapped 2 4 at seams.
When using nail down installation it s important to know the first and last rows of flooring have to be.
Walk the floor to check for loose or squeaky spots in the subfloor.
Use your miter saw to cut threshholds to the length of your doorway openings.
If you are wanting to nail the floor like they did then you would need to put a wood subfloor down and then nail the floor to that.
With a nail down engineered hardwood floor follow the same subfloor preparation steps as above including underlayment and laying spacers around the room s perimeter to maintain the manufacturer s recommended expansion gap.
The process involves nailing the flooring directly to a wood subfloor.
Set the quarter round shoe moulding on a piece of paper to keep it just a hair above the floor.
Some squeaking and crackling of the floor is normal when using the nail or staple down method and is not considered a defect.
Then nail the flooring planks with a standard flooring nailer see photo for details.
If the 1 1 2 in.
Lay the 1x4s perpendicular to the direction you intend to install the floor planks.
Pull all protruding nails.
To tighten the subfloor drive 2 in.