General notes for project on project information sheet g001 b.
Demo notes for flooring.
Get fair costs for your specific project requirements.
1 4 1 0 existing floor plan 2 scale.
Existing flooring in all work areas to be removed down to the concrete deck.
Arvada co 80004 6980 pierce st.
6 inches shall be placed between the concrete floor slab and the base course.
Intent of demolition is to return building to basic core and shell with a level floor.
Provide under floor net ventilation opening size and locations equal to 1 sq.
The cost to remove flooring starts at 1 26 2 46 per square foot but can vary significantly with site conditions and options.
General notes for demolition plan 101.
Arvada co 80003 06 07 13 issue for bidding and construction a1 1 8 1 ˇ0 first floor plan sheet notes demolition plans note 1 demo existing base and upper cabinets 2 demo existing.
Lincoln academy relocation rsn rsn 11323 000 ajw 7180 oak st.
Unit types 6 9 10 are new the demo for those instances is on d102.
See professionally prepared estimates for flooring removal work.
First floor demolition plan lincoln academy building corp.
Lincoln academy relocation rsn rsn 11323 000 ajw 7180 oak st.
All new masonry walls and infill that are in continuance with existing masonry walls shall be toothed into the existing coursing to achieve a uniform joint pattern and mortar strike to match the existing field verify all existing wall thicknesses.
Of under floor area and an access opening through the floor 18 x 24 min.
For each 150 sq.
General notes new construction on sheet a200 102.
If exists remove sheet applied tinting from all existing doors and windows.
See typical tasks and time to remove flooring along with per unit costs and material requirements.
The demolition drawings have been developed from.
Second floor plan lincoln academy building corp.
Any demolition work beyond that shown on the approved.
Comply with the requirements of the following notes in this set of drawings which also apply to the demolition floor plans.
Removals to include but not limited to vinyl composition tile carpet sheet flooring cermaic tile transitions adhesives mastics underlayment mortar bedding.
Labc section 1808 6 larc section r403 1 8 r506 1 4.
Remove all interior partitions floor finishes and existing ceilings to structure except where noted to remain on the demolition plan.
Demolition calculation 1 scale.
Partial demolition of a residential structure in association with a construction project is only permitted where indicated on the approved plans.