Cut one joist for every 16 inches of the pool s length.
Deck over pool edge.
Creating a deck extension takes planning to get it right but this is increased when building a deck extension over water.
Poured concrete tile brick and paver pool decking needs a slight slope in order for water to drain.
Lay them out spanning the pool.
The concrete can be decorated with stamping or staining.
Advertisement custom deck builder deck designer lancaster deck builder berks deck cleaning breyer construction landscape llc facebook page.
With wood decking water drains away between the boards so the slope is unnecessary.
You also can extend decking to completely surround your above ground pool.
Foam forms are secured on top of the wall then a concrete deck is poured up to the form to create a deck that comes right up and over the pool s edge.
This layout works well for a family that entertains often and the height of the deck is the only way to tell that the pool was.
If using composite decking consider placing joists at 12 inch centers to accommodate the added weight.
You ll want to do this if you have added a pool a pond or have another water feature.
The edge of a pool may collect water splashes and drips but the coping keeps water moving away from the pool.
The third reason you may not want to run the deck boards over the pool s top railing is it may make the deck sit too high in reference to the pool s water level.
Install an aluminum protected from the acq lumber bracket l from framing over the pool edge then install decking over that.
Make sure to measure well past the edge onto the concrete patio surrounding the pool to avoid any risk of the edge crumbling.
First you have to either have the entire deck framing structure rise above and over edge of the pool which means the top of the decking will be at least 8 or 9 inches above the top of pool coping.
You can be a true master woodworker and get that edge perfect but over time it won t stay that way.
Protects the pool shell and wall.
The coping causes water to flow away from the pool and toward your deck drains.
The coping prevents water from seeping in behind the pool shell and causing damage over time.
The water level for an above ground swimming pool is about six inches below.
If you build the deck surface over the edge of the above above ground pool a couple of challenges arise.